Concrete invoice template — yardage, pour day and overage

Concrete invoices live or die on yardage. These templates show ordered versus placed, so the overage line is arithmetic the customer can follow rather than a surprise.

3 free concrete invoice templates

An invoicing spreadsheet that opens in Excel, Numbers or Google Sheets, or prints to PDF. Pre-filled with the fields a concrete invoice needs, plus the payment terms this trade most often gets caught out by.

  1. Blank — the invoice fields, ready to fill in by hand.
  2. Auto-calculating — same sheet with subtotal, tax, deposit and balance due wired up. Formulas work in Excel and Google Sheets.
  3. Printable — a clean one-page layout to fill in or save as PDF.

Blank (Excel / Sheets) Auto-calculating Printable PDF

How concrete work actually gets paid

Concrete bills on cubic yards placed plus the crew day around the pour, and the yardage ordered is never exactly the yardage needed. The invoice has to show ordered, placed and any short-load fee, because a customer who sees only a total assumes the difference is margin. Pour day is weather-bound and the truck is booked regardless, so a cancellation inside the window is a real cost that belongs in the terms before it belongs on an invoice. Finish type changes the labour more than the material.

What a concrete invoice must contain

Where concrete invoices go unpaid

The estimate this invoice bills against

An invoice is only as defensible as the estimate it came from. BidWand writes the estimate from a plain description of the job — labour, materials, exclusions and assumptions — so the numbers on this invoice are ones the customer already agreed to.

Free concrete estimate template →

Draft the concrete estimate behind this invoice

This generates the estimate, not the invoice — describe the job and you get the itemised figures to bill from. No email needed to see the first one.

What you get — see the format first

A complete estimate you can send to the customer, built from the rate you enter:

Description Qty Unit Unit price Total
Labor — itemized by taskhrshouryour rate—
Materials — with your markup appliedqtyea / sq ftcost + markup—
Permits, disposal, access————

Plus a plain-English scope summary, assumptions (what had to be guessed), exclusions (what you are not doing — the section that prevents most change-order arguments), and a validity period. Printable, or send the link.

Every figure comes from the rate and markup you supply. We never fill in a market price for you.

Related guides

How much to charge

a concrete driveway · garage floor epoxy · drywall repair · junk removal · handyman work

Estimate templates by trade

concrete · window installation · deck building · gutter installation · insulation · tile installation · bathroom remodel · kitchen remodel

How to estimate

How to write a contractor estimate · Estimate vs quote vs bid — and which one you should send · What to include in a contractor estimate · How to price a job as a contractor · Should you charge for estimates? · How to follow up on an estimate · How to handle change orders · Estimate vs invoice: what's the difference? · How to raise your prices as a contractor

All 60 guides