Concrete is quoted per square foot, but the pour is the short part. Excavation, base and what happens to the old slab decide whether the job makes money.
Below: the published wage for this work, why your billing rate has to be well above it, how this job is actually priced, and what moves the number. Put your own rate into the generator and you get a real itemized estimate built on it.
Describe the job in plain words. No email needed to see your first estimate — about fifteen seconds for a small job, a little longer for a big one.
A complete estimate you can send to the customer, built from the rate you enter:
| Description | Qty | Unit | Unit price | Total |
|---|---|---|---|---|
| Labor — itemized by task | hrs | hour | your rate | — |
| Materials — with your markup applied | qty | ea / sq ft | cost + markup | — |
| Permits, disposal, access | — | — | — | — |
Plus a plain-English scope summary, assumptions (what had to be guessed), exclusions (what you are not doing — the section that prevents most change-order arguments), and a validity period. Printable, or send the link.
Every figure comes from the rate and markup you supply. We never fill in a market price for you.
Flatwork is priced per square foot at a given thickness, with the material component cross-checked against cubic yards ordered so waste and short loads are not absorbed silently. Reinforcement, sub-base preparation, excavation and haul-off of spoil or of an existing slab are separate lines. Finish type and any saw-cut or tooled control joints are priced on top, as is anything that affects placement, such as a pump for a driveway the truck cannot reach.
garage floor epoxy · gutter installation · snow removal · sod installation · driveway sealing
concrete · tree service · pressure washing · junk removal · siding · masonry · excavation · asphalt paving
How to write a contractor estimate · Estimate vs quote vs bid — and which one you should send · What to include in a contractor estimate · How to price a job as a contractor · Should you charge for estimates? · How to follow up on an estimate · How to handle change orders · Estimate vs invoice: what's the difference? · How to raise your prices as a contractor