The line items an insulation estimate needs — square footage, R-value, air sealing and ventilation — plus a generator that drafts one from your description of the space.
Describe the job in plain words. No email needed to see your first estimate — about fifteen seconds for a small job, a little longer for a big one.
A complete estimate you can send to the customer, built from the rate you enter:
| Description | Qty | Unit | Unit price | Total |
|---|---|---|---|---|
| Labor — itemized by task | hrs | hour | your rate | — |
| Materials — with your markup applied | qty | ea / sq ft | cost + markup | — |
| Permits, disposal, access | — | — | — | — |
Plus a plain-English scope summary, assumptions (what had to be guessed), exclusions (what you are not doing — the section that prevents most change-order arguments), and a validity period. Printable, or send the link.
Every figure comes from the rate and markup you supply. We never fill in a market price for you.
An estimating spreadsheet that opens in Excel, Numbers or Google Sheets, or prints to PDF. Pre-filled with the line items a insulation estimate should contain, plus a checklist of what insulation estimating most often leaves out — so you price it before you send, not after.
Insulation is bid per square foot at a stated R-value, and the R-value is the whole contract — the same square footage at R-30 and R-49 are different jobs. Blown, batt and spray foam price differently per square foot and behave differently in the same cavity. The work that actually determines performance is air sealing before anything is installed, and it is the line most often dropped to win a price. Attic access, depth and heat set the labour, not the area.
Generic AI quotes national averages. BidWand builds a price book from every estimate you send and every rate you correct, so by the fifth bid it prices like you do — your labor rate, your markup, your exclusions.
drywall repair · junk removal · handyman work · lawn care · gutter cleaning
tile installation · bathroom remodel · kitchen remodel · HVAC · plumbing · electrical · painting · roofing
How to write a contractor estimate · Estimate vs quote vs bid — and which one you should send · What to include in a contractor estimate · How to price a job as a contractor · Should you charge for estimates? · How to follow up on an estimate · How to handle change orders · Estimate vs invoice: what's the difference? · How to raise your prices as a contractor