A checklist you can run every estimate against. Most callbacks and disputes trace back to one of these being missing.
Your business name, license number where required, the customer name and the job address. An estimate that doesn't say where the work is happening isn't a document, it's a note.
Two or three sentences a homeowner can read without a trade dictionary, covering what gets removed, what gets installed, and what gets tested.
Labor with hours and rate; materials with quantity and unit price; permits, disposal and equipment as their own lines. The total should be arithmetic the customer can follow.
What you are assuming about existing conditions, and what is explicitly not in the price. These two sections prevent more disputes than everything else combined.
Validity window, deposit, payment schedule, and what happens if hidden conditions appear — normally a written change order before the work proceeds.
Describe the job in plain words. No email needed to see your first estimate — about fifteen seconds for a small job, a little longer for a big one.
A complete estimate you can send to the customer, built from the rate you enter:
| Description | Qty | Unit | Unit price | Total |
|---|---|---|---|---|
| Labor — itemized by task | hrs | hour | your rate | — |
| Materials — with your markup applied | qty | ea / sq ft | cost + markup | — |
| Permits, disposal, access | — | — | — | — |
Plus a plain-English scope summary, assumptions (what had to be guessed), exclusions (what you are not doing — the section that prevents most change-order arguments), and a validity period. Printable, or send the link.
Every figure comes from the rate and markup you supply. We never fill in a market price for you.
bathroom remodel · drywall repair · junk removal · handyman work · lawn care
general contracting · flooring · fencing · tree service · pressure washing · junk removal · siding · masonry
How to write a contractor estimate · Estimate vs quote vs bid — and which one you should send · How to price a job as a contractor · Should you charge for estimates? · How to follow up on an estimate · How to handle change orders · Estimate vs invoice: what's the difference? · How to raise your prices as a contractor