What a gutter estimate should contain — linear feet, downspouts, corners and fascia condition — plus a generator that drafts one from a plain description of the house.
Describe the job in plain words. No email needed to see your first estimate — about fifteen seconds for a small job, a little longer for a big one.
A complete estimate you can send to the customer, built from the rate you enter:
| Description | Qty | Unit | Unit price | Total |
|---|---|---|---|---|
| Labor — itemized by task | hrs | hour | your rate | — |
| Materials — with your markup applied | qty | ea / sq ft | cost + markup | — |
| Permits, disposal, access | — | — | — | — |
Plus a plain-English scope summary, assumptions (what had to be guessed), exclusions (what you are not doing — the section that prevents most change-order arguments), and a validity period. Printable, or send the link.
Every figure comes from the rate and markup you supply. We never fill in a market price for you.
An estimating spreadsheet that opens in Excel, Numbers or Google Sheets, or prints to PDF. Pre-filled with the line items a gutter installation estimate should contain, plus a checklist of what gutter installation estimating most often leaves out — so you price it before you send, not after.
Gutters are bid per linear foot of gutter plus per downspout, with a separate price for each inside and outside corner and each end cap. Seamless gutter is run on site from a coil, so the price assumes the truck can park within reach of the run. The variable nobody quotes is the fascia behind the gutter: if it is soft, it has to be replaced before anything hangs on it, and that is carpentry, not gutter work. Two-storey runs need ladder or staging time that a single-storey run does not.
Generic AI quotes national averages. BidWand builds a price book from every estimate you send and every rate you correct, so by the fifth bid it prices like you do — your labor rate, your markup, your exclusions.
gutter cleaning · bathroom remodel · exterior house painting · deck staining · window cleaning
insulation · tile installation · bathroom remodel · kitchen remodel · HVAC · plumbing · electrical · painting
How to write a contractor estimate · Estimate vs quote vs bid — and which one you should send · What to include in a contractor estimate · How to price a job as a contractor · Should you charge for estimates? · How to follow up on an estimate · How to handle change orders · Estimate vs invoice: what's the difference? · How to raise your prices as a contractor