Coating failures are almost never the coating. They are the preparation, and prep is the line most likely to be cut to win the bid.
Below: the published wage for this work, why your billing rate has to be well above it, how this job is actually priced, and what moves the number. Put your own rate into the generator and you get a real itemized estimate built on it.
Describe the job in plain words. No email needed to see your first estimate — about fifteen seconds for a small job, a little longer for a big one.
A complete estimate you can send to the customer, built from the rate you enter:
| Description | Qty | Unit | Unit price | Total |
|---|---|---|---|---|
| Labor — itemized by task | hrs | hour | your rate | — |
| Materials — with your markup applied | qty | ea / sq ft | cost + markup | — |
| Permits, disposal, access | — | — | — | — |
Plus a plain-English scope summary, assumptions (what had to be guessed), exclusions (what you are not doing — the section that prevents most change-order arguments), and a validity period. Printable, or send the link.
Every figure comes from the rate and markup you supply. We never fill in a market price for you.
Priced per square foot for a named coating system, because a single-day polyaspartic and a multi-coat epoxy with flake are different products, different cure schedules and different prices. Mechanical preparation — diamond grinding or shot blasting — is a separate line and is not optional. Crack and pit repair, moisture testing, and any oil contamination treatment are priced individually, since a slab that fails a moisture test cannot take the coating at all.
a concrete driveway · fence installation · tile installation · house cleaning · water heater replacement
concrete · fencing · tree service · pressure washing · junk removal · siding · masonry · excavation
How to write a contractor estimate · Estimate vs quote vs bid — and which one you should send · What to include in a contractor estimate · How to price a job as a contractor · Should you charge for estimates? · How to follow up on an estimate · How to handle change orders · Estimate vs invoice: what's the difference? · How to raise your prices as a contractor