The line items a deck estimate needs — deck area, railing length, footings and the inspection sequence — plus a generator that drafts one from your description of the build.
Describe the job in plain words. No email needed to see your first estimate — about fifteen seconds for a small job, a little longer for a big one.
A complete estimate you can send to the customer, built from the rate you enter:
| Description | Qty | Unit | Unit price | Total |
|---|---|---|---|---|
| Labor — itemized by task | hrs | hour | your rate | — |
| Materials — with your markup applied | qty | ea / sq ft | cost + markup | — |
| Permits, disposal, access | — | — | — | — |
Plus a plain-English scope summary, assumptions (what had to be guessed), exclusions (what you are not doing — the section that prevents most change-order arguments), and a validity period. Printable, or send the link.
Every figure comes from the rate and markup you supply. We never fill in a market price for you.
An estimating spreadsheet that opens in Excel, Numbers or Google Sheets, or prints to PDF. Pre-filled with the line items a deck building estimate should contain, plus a checklist of what deck building estimating most often leaves out — so you price it before you send, not after.
Decks are bid per square foot of deck surface plus per linear foot of railing, and the two scale differently — a small deck with a lot of perimeter is expensive per square foot. Footings are set by code and soil, not by the customer's budget, and the inspection sequence means the frame has to be seen before the boards go on. Material choice drives both cost and labour: composite fastens differently from wood and hides its own fasteners, which takes longer.
Generic AI quotes national averages. BidWand builds a price book from every estimate you send and every rate you correct, so by the fifth bid it prices like you do — your labor rate, your markup, your exclusions.
window cleaning · tree removal · fence installation · a concrete driveway · tile installation
gutter installation · insulation · tile installation · bathroom remodel · kitchen remodel · HVAC · plumbing · electrical
How to write a contractor estimate · Estimate vs quote vs bid — and which one you should send · What to include in a contractor estimate · How to price a job as a contractor · Should you charge for estimates? · How to follow up on an estimate · How to handle change orders · Estimate vs invoice: what's the difference? · How to raise your prices as a contractor