What an excavation estimate has to state — yardage, soil assumption, haul-off and machine time — plus a generator that drafts one from a plain description of the dig.
Describe the job in plain words. No email needed to see your first estimate — about fifteen seconds for a small job, a little longer for a big one.
A complete estimate you can send to the customer, built from the rate you enter:
| Description | Qty | Unit | Unit price | Total |
|---|---|---|---|---|
| Labor — itemized by task | hrs | hour | your rate | — |
| Materials — with your markup applied | qty | ea / sq ft | cost + markup | — |
| Permits, disposal, access | — | — | — | — |
Plus a plain-English scope summary, assumptions (what had to be guessed), exclusions (what you are not doing — the section that prevents most change-order arguments), and a validity period. Printable, or send the link.
Every figure comes from the rate and markup you supply. We never fill in a market price for you.
An estimating spreadsheet that opens in Excel, Numbers or Google Sheets, or prints to PDF. Pre-filled with the line items a excavation estimate should contain, plus a checklist of what excavation estimating most often leaves out — so you price it before you send, not after.
Excavation is bid per cubic yard moved and per hour of machine time, and the two numbers disagree whenever the soil is not what the bid assumed. Rock, clay and groundwater each change the yardage rate; so does whether the spoil stays on site or gets trucked. Haul-off is often the largest single line, because it is priced per load and the load count is set by the truck, not by the hole. Utility locates and the hand-digging around what they mark are the schedule risk.
Generic AI quotes national averages. BidWand builds a price book from every estimate you send and every rate you correct, so by the fifth bid it prices like you do — your labor rate, your markup, your exclusions.
drywall repair · junk removal · handyman work · lawn care · gutter cleaning
asphalt paving · window installation · deck building · gutter installation · insulation · tile installation · bathroom remodel · kitchen remodel
How to write a contractor estimate · Estimate vs quote vs bid — and which one you should send · What to include in a contractor estimate · How to price a job as a contractor · Should you charge for estimates? · How to follow up on an estimate · How to handle change orders · Estimate vs invoice: what's the difference? · How to raise your prices as a contractor