Paving invoices must reconcile square feet against tons delivered. These templates show both, plus the base work that decided the price.
An invoicing spreadsheet that opens in Excel, Numbers or Google Sheets, or prints to PDF. Pre-filled with the fields a asphalt paving invoice needs, plus the payment terms this trade most often gets caught out by.
Paving bills by square foot or by ton, and the invoice should carry both so they can be checked against each other — tonnage is area times compacted depth times mix density, and a customer who sees only one number cannot verify anything. Mix is bought hot and laid the same day, so a weather cancellation inside the plant's window is a genuine cost. Undercut where the base failed at proof roll is the common overage and needs its agreed unit rate on the invoice, not a lump sum.
An invoice is only as defensible as the estimate it came from. BidWand writes the estimate from a plain description of the job — labour, materials, exclusions and assumptions — so the numbers on this invoice are ones the customer already agreed to.
This generates the estimate, not the invoice — describe the job and you get the itemised figures to bill from. No email needed to see the first one.
A complete estimate you can send to the customer, built from the rate you enter:
| Description | Qty | Unit | Unit price | Total |
|---|---|---|---|---|
| Labor — itemized by task | hrs | hour | your rate | — |
| Materials — with your markup applied | qty | ea / sq ft | cost + markup | — |
| Permits, disposal, access | — | — | — | — |
Plus a plain-English scope summary, assumptions (what had to be guessed), exclusions (what you are not doing — the section that prevents most change-order arguments), and a validity period. Printable, or send the link.
Every figure comes from the rate and markup you supply. We never fill in a market price for you.
fence installation · a concrete driveway · tile installation · house cleaning · water heater replacement
asphalt paving · HVAC · plumbing · electrical · painting · roofing · landscaping · handyman
How to write a contractor estimate · Estimate vs quote vs bid — and which one you should send · What to include in a contractor estimate · How to price a job as a contractor · Should you charge for estimates? · How to follow up on an estimate · How to handle change orders · Estimate vs invoice: what's the difference? · How to raise your prices as a contractor