Painting estimates live or die on prep and square footage. Here's the structure, plus a generator that drafts one from your walkthrough notes.
Describe the job in plain words. No email needed to see your first estimate — about fifteen seconds for a small job, a little longer for a big one.
A complete estimate you can send to the customer, built from the rate you enter:
| Description | Qty | Unit | Unit price | Total |
|---|---|---|---|---|
| Labor — itemized by task | hrs | hour | your rate | — |
| Materials — with your markup applied | qty | ea / sq ft | cost + markup | — |
| Permits, disposal, access | — | — | — | — |
Plus a plain-English scope summary, assumptions (what had to be guessed), exclusions (what you are not doing — the section that prevents most change-order arguments), and a validity period. Printable, or send the link.
Every figure comes from the rate and markup you supply. We never fill in a market price for you.
An estimating spreadsheet that opens in Excel, Numbers or Google Sheets, or prints to PDF. Pre-filled with the line items a painting estimate should contain, plus a checklist of what painting estimating most often leaves out — so you price it before you send, not after.
Painting is bid by measured surface area, with prep estimated separately in crew-hours because it is what varies between two rooms of identical size. Walls, ceilings and trim run at different production rates and should be priced at different rates. The number of colors and the masking load drive the schedule as much as the square footage does.
$23.75/hour — US median wage for painters, construction and maintenance, May 2025 ($49,400/year).
That is a wage, not your billing rate. It excludes payroll burden, insurance, the hours you spend driving and quoting, overhead and profit. Billing at or near it means working the job for free once those land — which is where underpricing starts. What your multiplier should be depends on your business, so put the rate you actually bill into the generator and every line prices from your number.
Source: US Bureau of Labor Statistics, Occupational Outlook Handbook — national median, May 2025. Wages vary widely by metro.
Generic AI quotes national averages. BidWand builds a price book from every estimate you send and every rate you correct, so by the fifth bid it prices like you do — your labor rate, your markup, your exclusions.
interior painting · exterior house painting · deck staining · cabinet painting · garage floor epoxy
roofing · landscaping · handyman · cleaning · general contracting · concrete · drywall · flooring
How to write a contractor estimate · Estimate vs quote vs bid — and which one you should send · What to include in a contractor estimate · How to price a job as a contractor · Should you charge for estimates? · How to follow up on an estimate · How to handle change orders · Estimate vs invoice: what's the difference? · How to raise your prices as a contractor