Painting invoice template — by area, coat and phase

Painting invoices get disputed over what 'finished' means. These templates bill by area and coat, and keep the touch-up holdback visible instead of implied.

3 free painting invoice templates

An invoicing spreadsheet that opens in Excel, Numbers or Google Sheets, or prints to PDF. Pre-filled with the fields a painting invoice needs, plus the payment terms this trade most often gets caught out by.

  1. Blank — the invoice fields, ready to fill in by hand.
  2. Auto-calculating — same sheet with subtotal, tax, deposit and balance due wired up. Formulas work in Excel and Google Sheets.
  3. Printable — a clean one-page layout to fill in or save as PDF.

Blank (Excel / Sheets) Auto-calculating Printable PDF

How painting work actually gets paid

Painting bills by area and by number of coats, with a deposit covering material because paint is bought before the first day. Progress billing follows rooms or elevations completed rather than calendar time, which is what a customer can actually verify. The last few percent is where the money sits: almost every job ends with a punch list, and an invoice that does not show a touch-up holdback invites the customer to invent one by simply not paying the balance.

What a painting invoice must contain

Where painting invoices go unpaid

The estimate this invoice bills against

An invoice is only as defensible as the estimate it came from. BidWand writes the estimate from a plain description of the job — labour, materials, exclusions and assumptions — so the numbers on this invoice are ones the customer already agreed to.

Free painting estimate template →

Draft the painting estimate behind this invoice

This generates the estimate, not the invoice — describe the job and you get the itemised figures to bill from. No email needed to see the first one.

What you get — see the format first

A complete estimate you can send to the customer, built from the rate you enter:

Description Qty Unit Unit price Total
Labor — itemized by taskhrshouryour rate—
Materials — with your markup appliedqtyea / sq ftcost + markup—
Permits, disposal, access————

Plus a plain-English scope summary, assumptions (what had to be guessed), exclusions (what you are not doing — the section that prevents most change-order arguments), and a validity period. Printable, or send the link.

Every figure comes from the rate and markup you supply. We never fill in a market price for you.

Related guides

How much to charge

interior painting · exterior house painting · deck staining · cabinet painting · junk removal

Estimate templates by trade

painting · HVAC · plumbing · electrical · roofing · landscaping · handyman · cleaning

How to estimate

How to write a contractor estimate · Estimate vs quote vs bid — and which one you should send · What to include in a contractor estimate · How to price a job as a contractor · Should you charge for estimates? · How to follow up on an estimate · How to handle change orders · Estimate vs invoice: what's the difference? · How to raise your prices as a contractor

All 60 guides