Sealing is quick, cheap to deliver, and easy to underprice — because the crack filling and oil spot priming that make it last are not what the customer thinks they are buying.
Below: the published wage for this work, why your billing rate has to be well above it, how this job is actually priced, and what moves the number. Put your own rate into the generator and you get a real itemized estimate built on it.
Describe the job in plain words. No email needed to see your first estimate — about fifteen seconds for a small job, a little longer for a big one.
A complete estimate you can send to the customer, built from the rate you enter:
| Description | Qty | Unit | Unit price | Total |
|---|---|---|---|---|
| Labor — itemized by task | hrs | hour | your rate | — |
| Materials — with your markup applied | qty | ea / sq ft | cost + markup | — |
| Permits, disposal, access | — | — | — | — |
Plus a plain-English scope summary, assumptions (what had to be guessed), exclusions (what you are not doing — the section that prevents most change-order arguments), and a validity period. Printable, or send the link.
Every figure comes from the rate and markup you supply. We never fill in a market price for you.
Priced per square foot of driveway for a stated number of coats. Crack filling is a separate line measured in linear feet, and oil spot priming is per spot, because both are what determine whether the seal holds. Cleaning beforehand is its own step. Number of coats is a real variable and must be stated: a customer comparing your two-coat price against someone else's single coat is not comparing the same job.
pressure washing · junk removal · handyman work · lawn care · gutter cleaning
pressure washing · deck building · gutter installation · insulation · tile installation · bathroom remodel · kitchen remodel · HVAC
How to write a contractor estimate · Estimate vs quote vs bid — and which one you should send · What to include in a contractor estimate · How to price a job as a contractor · Should you charge for estimates? · How to follow up on an estimate · How to handle change orders · Estimate vs invoice: what's the difference? · How to raise your prices as a contractor