Painting contract template — coats, prep and what 'finished' means

Painting contracts are argued over the definition of done. Here is how to define coats, preparation and acceptance before the first drop cloth goes down.

Read this before you use it

This is a checklist of what a painting contract has to settle — not a ready-to-sign legal document, and not legal advice. Most states regulate home improvement contracts: required disclosures, cancellation windows, deposit limits and licence display all vary, and some trades carry extra rules. Adapt this, then have a lawyer in your state review it before you put it in front of a customer.

painting contract checklist

Download as a spreadsheet to work through, or print it to sit alongside your own agreement.

Checklist (Excel / Sheets) Printable PDF

What a painting contract has to settle

A painting contract has to define finished, because the customer's definition and the painter's will differ. Number of coats, the surfaces included, and the preparation standard all belong in the scope in writing — 'two coats' means nothing if the contract does not also say over what preparation. Lead-safe practices are a legal requirement on pre-1978 housing and are not optional or negotiable. Acceptance should have a method and a deadline, or the last ten percent of the money sits behind an open-ended punch list.

Clauses it needs

What painting contracts actually get argued over

The estimate this contract is built on

A contract can only be as clear as the scope it references. BidWand drafts the itemised estimate — labour, materials, exclusions and assumptions — that the scope and exclusions clauses point at.

Free painting estimate template →

Draft the painting estimate this contract references

This generates the estimate, not the contract — describe the job and you get the itemised scope to attach. No email needed to see the first one.

What you get — see the format first

A complete estimate you can send to the customer, built from the rate you enter:

Description Qty Unit Unit price Total
Labor — itemized by taskhrshouryour rate—
Materials — with your markup appliedqtyea / sq ftcost + markup—
Permits, disposal, access————

Plus a plain-English scope summary, assumptions (what had to be guessed), exclusions (what you are not doing — the section that prevents most change-order arguments), and a validity period. Printable, or send the link.

Every figure comes from the rate and markup you supply. We never fill in a market price for you.

Related guides

How much to charge

interior painting · exterior house painting · deck staining · cabinet painting · handyman work

Estimate templates by trade

painting · tree service · pressure washing · junk removal · siding · masonry · excavation · asphalt paving

How to estimate

How to write a contractor estimate · Estimate vs quote vs bid — and which one you should send · What to include in a contractor estimate · How to price a job as a contractor · Should you charge for estimates? · How to follow up on an estimate · How to handle change orders · Estimate vs invoice: what's the difference? · How to raise your prices as a contractor

All 60 guides