BidWand

Excavation invoice template — yardage, loads and machine time

Excavation invoices are settled by haul tickets. These templates put yardage, load count and machine hours where the customer can check them.

3 free excavation invoice templates

An invoicing spreadsheet that opens in Excel, Numbers or Google Sheets, or prints to PDF. Pre-filled with the fields a excavation invoice needs, plus the payment terms this trade most often gets caught out by.

  1. Blank — the invoice fields, ready to fill in by hand.
  2. Auto-calculating — same sheet with subtotal, tax, deposit and balance due wired up. Formulas work in Excel and Google Sheets.
  3. Printable — a clean one-page layout to fill in or save as PDF.

Blank (Excel / Sheets) Auto-calculating Printable PDF

How excavation work actually gets paid

Excavation bills per cubic yard moved and per hour of machine time, and the two have to reconcile against haul tickets — the ticket is the evidence and it should be referenced on the invoice. Soil that is not what the bid assumed is the standard dispute: rock, clay and groundwater each change the rate, so the contract needs a unit rate for unsuitable material and the invoice needs to bill against it rather than absorbing or inventing a number. Standby time when trucks are late is real and needs a term behind it.

What a excavation invoice must contain

Where excavation invoices go unpaid

The estimate this invoice bills against

An invoice is only as defensible as the estimate it came from. BidWand writes the estimate from a plain description of the job — labour, materials, exclusions and assumptions — so the numbers on this invoice are ones the customer already agreed to.

Free excavation estimate template →

Draft the excavation estimate behind this invoice

This generates the estimate, not the invoice — describe the job and you get the itemised figures to bill from. No email needed to see the first one.

What you get — see the format first

A complete estimate you can send to the customer, built from the rate you enter:

Description Qty Unit Unit price Total
Labor — itemized by taskhrshouryour rate—
Materials — with your markup appliedqtyea / sq ftcost + markup—
Permits, disposal, access————

Plus a plain-English scope summary, assumptions (what had to be guessed), exclusions (what you are not doing — the section that prevents most change-order arguments), and a validity period. Printable, or send the link.

Every figure comes from the rate and markup you supply. We never fill in a market price for you.

Related guides

How much to charge

bathroom remodel · exterior house painting · deck staining · window cleaning · tree removal

Estimate templates by trade

excavation · roofing · landscaping · handyman · cleaning · general contracting · concrete · drywall

How to estimate

How to write a contractor estimate · Estimate vs quote vs bid — and which one you should send · What to include in a contractor estimate · How to price a job as a contractor · Should you charge for estimates? · How to follow up on an estimate · How to handle change orders · Estimate vs invoice: what's the difference? · How to raise your prices as a contractor

All 60 guides