Junk removal is priced by volume but charged by the landfill on weight. These templates show both, so the disposal line makes sense.
An invoicing spreadsheet that opens in Excel, Numbers or Google Sheets, or prints to PDF. Pre-filled with the fields a junk removal invoice needs, plus the payment terms this trade most often gets caught out by.
Junk removal quotes by truck volume — a quarter load, a half load — but the transfer station charges by the ton, and heavy loads like concrete, soil and shingles break the volume model completely. The invoice has to show the volume basis and any weight overage, or the customer sees a number that does not match the quote. Certain items carry their own disposal fees by law: mattresses, tyres, appliances with refrigerant, paint, electronics. Stairs and long carries are labour the volume price never covered.
An invoice is only as defensible as the estimate it came from. BidWand writes the estimate from a plain description of the job — labour, materials, exclusions and assumptions — so the numbers on this invoice are ones the customer already agreed to.
This generates the estimate, not the invoice — describe the job and you get the itemised figures to bill from. No email needed to see the first one.
A complete estimate you can send to the customer, built from the rate you enter:
| Description | Qty | Unit | Unit price | Total |
|---|---|---|---|---|
| Labor — itemized by task | hrs | hour | your rate | — |
| Materials — with your markup applied | qty | ea / sq ft | cost + markup | — |
| Permits, disposal, access | — | — | — | — |
Plus a plain-English scope summary, assumptions (what had to be guessed), exclusions (what you are not doing — the section that prevents most change-order arguments), and a validity period. Printable, or send the link.
Every figure comes from the rate and markup you supply. We never fill in a market price for you.
junk removal · pressure washing · interior painting · drywall repair · handyman work
junk removal · fencing · tree service · pressure washing · siding · masonry · excavation · asphalt paving
How to write a contractor estimate · Estimate vs quote vs bid — and which one you should send · What to include in a contractor estimate · How to price a job as a contractor · Should you charge for estimates? · How to follow up on an estimate · How to handle change orders · Estimate vs invoice: what's the difference? · How to raise your prices as a contractor