Excavation contract template — differing site conditions and utilities

Excavation has the oldest clause in construction law attached to it: differing site conditions. Here is what the contract has to settle before the machine arrives.

Read this before you use it

This is a checklist of what a excavation contract has to settle — not a ready-to-sign legal document, and not legal advice. Most states regulate home improvement contracts: required disclosures, cancellation windows, deposit limits and licence display all vary, and some trades carry extra rules. Adapt this, then have a lawyer in your state review it before you put it in front of a customer.

excavation contract checklist

Download as a spreadsheet to work through, or print it to sit alongside your own agreement.

Checklist (Excel / Sheets) Printable PDF

What a excavation contract has to settle

Excavation contracts exist to allocate the risk of what is underground, which nobody knows at signing. The differing-site-conditions clause is the mechanism: it names what the price assumes about the soil, and the unit rate that applies when reality differs. Without it, rock is a negotiation held while a machine sits idle. Utility locates are the other half — who calls, how long the wait is, and what happens if an unmarked line is struck despite a clean locate.

Clauses it needs

What excavation contracts actually get argued over

The estimate this contract is built on

A contract can only be as clear as the scope it references. BidWand drafts the itemised estimate — labour, materials, exclusions and assumptions — that the scope and exclusions clauses point at.

Free excavation estimate template →

Draft the excavation estimate this contract references

This generates the estimate, not the contract — describe the job and you get the itemised scope to attach. No email needed to see the first one.

What you get — see the format first

A complete estimate you can send to the customer, built from the rate you enter:

Description Qty Unit Unit price Total
Labor — itemized by taskhrshouryour rate—
Materials — with your markup appliedqtyea / sq ftcost + markup—
Permits, disposal, access————

Plus a plain-English scope summary, assumptions (what had to be guessed), exclusions (what you are not doing — the section that prevents most change-order arguments), and a validity period. Printable, or send the link.

Every figure comes from the rate and markup you supply. We never fill in a market price for you.

Related guides

How much to charge

pressure washing · interior painting · drywall repair · junk removal · handyman work

Estimate templates by trade

excavation · concrete · drywall · flooring · fencing · tree service · pressure washing · junk removal

How to estimate

How to write a contractor estimate · Estimate vs quote vs bid — and which one you should send · What to include in a contractor estimate · How to price a job as a contractor · Should you charge for estimates? · How to follow up on an estimate · How to handle change orders · Estimate vs invoice: what's the difference? · How to raise your prices as a contractor

All 60 guides