Paving contracts should settle three things: what the base is assumed to be, where water goes, and when the surface can be driven on.
This is a checklist of what a asphalt paving contract has to settle — not a ready-to-sign legal document, and not legal advice. Most states regulate home improvement contracts: required disclosures, cancellation windows, deposit limits and licence display all vary, and some trades carry extra rules. Adapt this, then have a lawyer in your state review it before you put it in front of a customer.
Download as a spreadsheet to work through, or print it to sit alongside your own agreement.
A paving contract allocates the risk of the base, which cannot be fully known until the existing surface is off and proof-rolled. Undercut for soft spots is the standard overage and needs a unit rate. Drainage deserves its own clause: a flat lot that ponds is not a defect in the asphalt, but the customer will call it one unless the contract addressed grade. The cure clause matters practically — the surface takes traffic before it is fully cured, and damage during that window is the customer's if the contract said so.
A contract can only be as clear as the scope it references. BidWand drafts the itemised estimate — labour, materials, exclusions and assumptions — that the scope and exclusions clauses point at.
This generates the estimate, not the contract — describe the job and you get the itemised scope to attach. No email needed to see the first one.
A complete estimate you can send to the customer, built from the rate you enter:
| Description | Qty | Unit | Unit price | Total |
|---|---|---|---|---|
| Labor — itemized by task | hrs | hour | your rate | — |
| Materials — with your markup applied | qty | ea / sq ft | cost + markup | — |
| Permits, disposal, access | — | — | — | — |
Plus a plain-English scope summary, assumptions (what had to be guessed), exclusions (what you are not doing — the section that prevents most change-order arguments), and a validity period. Printable, or send the link.
Every figure comes from the rate and markup you supply. We never fill in a market price for you.
gutter installation · snow removal · sod installation · garage floor epoxy · driveway sealing
asphalt paving · drywall · flooring · fencing · tree service · pressure washing · junk removal · siding
How to write a contractor estimate · Estimate vs quote vs bid — and which one you should send · What to include in a contractor estimate · How to price a job as a contractor · Should you charge for estimates? · How to follow up on an estimate · How to handle change orders · Estimate vs invoice: what's the difference? · How to raise your prices as a contractor