BidWand

Bathroom remodel invoice template — draws and allowances

A bathroom remodel invoice is a draw against a schedule, with allowances reconciled. These templates are built to bill that way.

3 free bathroom remodel invoice templates

An invoicing spreadsheet that opens in Excel, Numbers or Google Sheets, or prints to PDF. Pre-filled with the fields a bathroom remodel invoice needs, plus the payment terms this trade most often gets caught out by.

  1. Blank — the invoice fields, ready to fill in by hand.
  2. Auto-calculating — same sheet with subtotal, tax, deposit and balance due wired up. Formulas work in Excel and Google Sheets.
  3. Printable — a clean one-page layout to fill in or save as PDF.

Blank (Excel / Sheets) Auto-calculating Printable PDF

How bathroom remodel work actually gets paid

Bathroom remodels bill in draws tied to stages — demolition, rough-in, close-up, finish — because the money has to arrive before each trade does. Allowances are the other half: fixtures and tile are chosen late, so the contract carries an allowance and the invoice reconciles what was actually selected against it, up or down. Concealed conditions are near-certain in a bathroom, since it holds the oldest plumbing in most houses, and the allowance for them needs its unit rates stated rather than negotiated once a wall is open.

What a bathroom remodel invoice must contain

Where bathroom remodel invoices go unpaid

The estimate this invoice bills against

An invoice is only as defensible as the estimate it came from. BidWand writes the estimate from a plain description of the job — labour, materials, exclusions and assumptions — so the numbers on this invoice are ones the customer already agreed to.

Free bathroom remodel estimate template →

Draft the bathroom remodel estimate behind this invoice

This generates the estimate, not the invoice — describe the job and you get the itemised figures to bill from. No email needed to see the first one.

What you get — see the format first

A complete estimate you can send to the customer, built from the rate you enter:

Description Qty Unit Unit price Total
Labor — itemized by taskhrshouryour rate—
Materials — with your markup appliedqtyea / sq ftcost + markup—
Permits, disposal, access————

Plus a plain-English scope summary, assumptions (what had to be guessed), exclusions (what you are not doing — the section that prevents most change-order arguments), and a validity period. Printable, or send the link.

Every figure comes from the rate and markup you supply. We never fill in a market price for you.

Related guides

How much to charge

exterior house painting · deck staining · window cleaning · tree removal · fence installation

Estimate templates by trade

bathroom remodel · flooring · fencing · tree service · pressure washing · junk removal · siding · masonry

How to estimate

How to write a contractor estimate · Estimate vs quote vs bid — and which one you should send · What to include in a contractor estimate · How to price a job as a contractor · Should you charge for estimates? · How to follow up on an estimate · How to handle change orders · Estimate vs invoice: what's the difference? · How to raise your prices as a contractor

All 60 guides