Flooring contract template — subfloor, moisture and acclimation

Most flooring failures trace to the subfloor or to moisture, and most flooring disputes trace to a contract that never mentioned either.

Read this before you use it

This is a checklist of what a flooring contract has to settle — not a ready-to-sign legal document, and not legal advice. Most states regulate home improvement contracts: required disclosures, cancellation windows, deposit limits and licence display all vary, and some trades carry extra rules. Adapt this, then have a lawyer in your state review it before you put it in front of a customer.

flooring contract checklist

Download as a spreadsheet to work through, or print it to sit alongside your own agreement.

Checklist (Excel / Sheets) Printable PDF

What a flooring contract has to settle

A flooring contract has to address what is underneath and what is in the air. Subfloor condition cannot be fully known until the old floor is up, so it needs an allowance with unit rates. Moisture is the one that voids manufacturer warranties: on slab, a moisture test belongs in the contract as a precondition, with a stated course of action if it fails. Acclimation time is a manufacturer requirement, not a preference, and skipping it to hit a date shifts liability squarely onto whoever agreed to skip it.

Clauses it needs

What flooring contracts actually get argued over

The estimate this contract is built on

A contract can only be as clear as the scope it references. BidWand drafts the itemised estimate — labour, materials, exclusions and assumptions — that the scope and exclusions clauses point at.

Free flooring estimate template →

Draft the flooring estimate this contract references

This generates the estimate, not the contract — describe the job and you get the itemised scope to attach. No email needed to see the first one.

What you get — see the format first

A complete estimate you can send to the customer, built from the rate you enter:

Description Qty Unit Unit price Total
Labor — itemized by taskhrshouryour rate—
Materials — with your markup appliedqtyea / sq ftcost + markup—
Permits, disposal, access————

Plus a plain-English scope summary, assumptions (what had to be guessed), exclusions (what you are not doing — the section that prevents most change-order arguments), and a validity period. Printable, or send the link.

Every figure comes from the rate and markup you supply. We never fill in a market price for you.

Related guides

How much to charge

tile installation · gutter cleaning · bathroom remodel · exterior house painting · deck staining

Estimate templates by trade

flooring · handyman · cleaning · general contracting · concrete · drywall · fencing · tree service

How to estimate

How to write a contractor estimate · Estimate vs quote vs bid — and which one you should send · What to include in a contractor estimate · How to price a job as a contractor · Should you charge for estimates? · How to follow up on an estimate · How to handle change orders · Estimate vs invoice: what's the difference? · How to raise your prices as a contractor

All 60 guides