Press Cmd/Ctrl + P and choose “Save as PDF”. Prefer a spreadsheet?
Customer ____________________________ · Job address ____________________________
| Description | Qty | Unit | Unit price | Total |
|---|---|---|---|---|
| Square footage by surface — floor, wall, shower pan, niche, curb | ||||
| Tile size, material and the layout pattern, with a waste percentage | ||||
| Substrate: existing condition and what is being removed | ||||
| Flattening — self-levelling compound or floor patch, by area | ||||
| Backer board or uncoupling membrane, with the fastening | ||||
| Waterproofing system in wet areas, and a flood test on the pan | ||||
| Setting material and grout type — cement, epoxy — with colour | ||||
| Trim, edge profile, transitions and thresholds by linear foot | ||||
| Sealing and final cleaning | ||||
| Labour as setter hours separated from prep hours | ||||
| Subtotal | ||||
Blank template from bidwand.com.