Customer ____________________________ · Job address ____________________________
| Description | Qty | Unit | Unit price | Total |
|---|---|---|---|---|
| Each opening listed separately with its field-measured size | ||||
| Insert retrofit or full-frame replacement, stated per opening | ||||
| Unit specification — frame material, glass package, U-factor and SHGC | ||||
| Interior and exterior trim: reuse, repair or replace | ||||
| Flashing, sill pan and the weather barrier tie-in | ||||
| Insulation and air sealing of the rough opening | ||||
| Interior finish — casing, caulk, paint touch-up if in scope | ||||
| Disposal of the old units | ||||
| Labour as installer hours per opening, not one blended number | ||||
| Lead-safe work practices where the house predates 1978 | ||||
| Subtotal | ||||
Blank template from bidwand.com.