Press Cmd/Ctrl + P and choose “Save as PDF”. Prefer a spreadsheet?

flooring estimate
Prepared by ____________________
Date ____________
Valid 30 days

Customer ____________________________ · Job address ____________________________

DescriptionQtyUnitUnit priceTotal
Square footage by room, plus a waste factor stated as a percentage
Material by product line, with the pattern if it drives waste
Removal and disposal of the existing floor
Subfloor preparation — leveling compound, sanding, or fastening squeaks
Moisture barrier or underlayment
Transitions, thresholds and stair nosing
Baseboard or shoe moulding removal and reinstallation
Undercutting door jambs, and doors trimmed to clear
Furniture moving, or that it is excluded
Labor as crew days × rate
Subtotal
Before you send — commonly missed on flooring jobs
Exclusions
Assumptions

Blank template from bidwand.com.