Press Cmd/Ctrl + P and choose “Save as PDF”. Prefer a spreadsheet?
Customer ____________________________ · Job address ____________________________
| Description | Qty | Unit | Unit price | Total |
|---|---|---|---|---|
| Square footage by room, plus a waste factor stated as a percentage | ||||
| Material by product line, with the pattern if it drives waste | ||||
| Removal and disposal of the existing floor | ||||
| Subfloor preparation — leveling compound, sanding, or fastening squeaks | ||||
| Moisture barrier or underlayment | ||||
| Transitions, thresholds and stair nosing | ||||
| Baseboard or shoe moulding removal and reinstallation | ||||
| Undercutting door jambs, and doors trimmed to clear | ||||
| Furniture moving, or that it is excluded | ||||
| Labor as crew days × rate | ||||
| Subtotal | ||||
Blank template from bidwand.com.