Press Cmd/Ctrl + P and choose “Save as PDF”. Prefer a spreadsheet?
Not a legal document and not legal advice. Home improvement contracts are regulated differently in every state. Have a lawyer in your state review your agreement before you use it.
| Settled in writing? | |
|---|---|
| ☐ | Parties, licence number, and every opening listed with its size |
| ☐ | Who performs the field measurements, and who bears a sizing error |
| ☐ | Insert or full-frame installation, stated per opening |
| ☐ | Unit specification: frame material, glass package, U-factor and SHGC |
| ☐ | Rot and jamb repair allowance, with a per-opening rate |
| ☐ | Lead-safe work practices where the property predates 1978 |
| ☐ | Egress sizing where a bedroom window is replaced |
| ☐ | Flashing, sill pan and air sealing named in the scope |
| ☐ | Lead times, storage of delivered units, and weather-tight-by-end-of-day terms |
| ☐ | Manufacturer warranty registration, and the installation warranty term |
Checklist from bidwand.com.