Press Cmd/Ctrl + P and choose “Save as PDF”. Prefer a spreadsheet?
Not a legal document and not legal advice. Home improvement contracts are regulated differently in every state. Have a lawyer in your state review your agreement before you use it.
| Settled in writing? | |
|---|---|
| ☐ | Parties, licence number, and the surfaces and square footage in scope |
| ☐ | Tile size, material, layout pattern, and the waste percentage |
| ☐ | Substrate flatness tolerance, and the rate for levelling if it is not met |
| ☐ | Backer board or uncoupling membrane specified by product |
| ☐ | Waterproofing system in wet areas, with the flood test in the schedule |
| ☐ | Acceptable lippage, stated as a measurement |
| ☐ | Grout type, colour and sealing, with the cure period before use |
| ☐ | Who supplies the tile, and who bears a shortfall or a discontinued lot |
| ☐ | Demolition and disposal of existing surfaces |
| ☐ | Warranty on the installation, separate from the tile manufacturer's |
Checklist from bidwand.com.