Press Cmd/Ctrl + P and choose “Save as PDF”. Prefer a spreadsheet?
Not a legal document and not legal advice. Home improvement contracts are regulated differently in every state. Have a lawyer in your state review your agreement before you use it.
| Settled in writing? | |
|---|---|
| ☐ | Parties, licence number, and the permit the work will be performed under |
| ☐ | Scope by circuit, device and panel work, with load calculations referenced |
| ☐ | Permit responsibility and who schedules each inspection |
| ☐ | Final payment tied to inspection sign-off, with the failure case addressed |
| ☐ | Re-inspection cost allocation, by whose fault triggered it |
| ☐ | Utility coordination: who contacts them, and how delays affect the schedule |
| ☐ | Concealed conditions in existing wiring, with allowance and unit rates |
| ☐ | Payment schedule with progress points that do not run ahead of inspection |
| ☐ | Change orders: written, dated, priced, and signed before the work proceeds |
| ☐ | Warranty on workmanship, separate from manufacturer warranty on devices |
Checklist from bidwand.com.